Which task in building the Great Pyramid is documented by ancient Egyptian logbooks discovered by the Red Sea in 2013?
The logbooks describe transporting limestone to the Great Pyramid's construction site by boat. The records of the overseer Merer are particularly well preserved. They describe his crew's work bringing limestone from the Tura quarries along waterways to Khufu's pyramid project. The papyrus fragments were found in 2013 at Wadi el-Jarf, an ancient Egyptian port on the Red Sea. The discovery site and the described transport route are therefore not the same: the trips to the pyramid followed the Nile system, rather than the Red Sea all the way to the building site. The archive belonged to a crew that undertook various tasks. The records matter because they document a specific part of construction organization from the time the pyramid was built. They are not a complete construction manual. Boat transport does not explain how the stones were subsequently lifted to the upper courses. The answer illustration therefore shows a general transport scene, not an exact reconstruction of Merer's vessel or harbor facilities.


